We have known for many years that the Prospect Highway (Reconciliation Drive) and the Blacktown-Wetherill Park Transitway were to be built through the Boral Quarry and that there would be an impact to the Lower Prospect Canal Cycleway. However, the RTA and Boral have consistently indicated that this wouldn't happen before 2016. We were always assured that the heritage issues of the canal would be appropriately addressed, but if a section needed to be removed that a bridge would be built to ensure that SAFE passage over the road corridor would be available. As an example, here is an exchange of correspondence between CRAG and the RTA back in 2001 where our fears were allayed. Note the sentence in the RTA reply that states: "Your organisation would be consulted for comment when detailed planning for the bridge commences."A reasonable person would be forgiven for believing that a bridge was to be built and that the community would be consulted if this changed. But that hasn't happened has it! Quietly in 2005, Boral applied for permission to have a section of the canal exempted from heritage protection. The application and approval received back from the Heritage Branch of NSW Planning both refer to the bridge that would replace the missing section of cycleway. Boral even submitted RTA plans that showed a bridge. It looked like this (click for larger image in a new window):
Boral's Concept Master Plan also clearly shows a "New Bicycle Bridge". All seems rosy, then out of the blue we find the following. In Item 8 on page 9 of Boral's Preferred Project Report the following is attributed to the RTA: Issues Raised by RTA(Date:18 January 2007) 8. The Cycleway Bridge proposed as part of the Lower Canal Cycleway linking Prospect Reservoir to Guildford (Bay to Mountains via Holroyd in Bike Plan 2010) is not part of the current proposal and that the cycleway crossing of the North-South Spine Road would be incorporated into the proposed traffic signals at Roads 7 & 8.On page 39 of the same document under Table 3.1 (Revised Statement of Commitments) at item 28 Boral states the following: At Widemere where the southern cut crosses the canal, Boral will replace the cycleway with an at grade crossing designed to specifications agreed with the RTA and incorporated in the Revised Deed of Agreement.So after years of leading us to believe that a bridge was a forgone conclusion, that we needn't worry about losing a SAFE cycleway, one day, we wake up and find that some anonymous bureaucrat in the RTA has just stolen our bridge. It is just NOT ACCEPTABLE that some faceless bureaucrat makes a decision like this, without community consultation, and vanishes into the labyrinth of the RTA, safe from the consequences of their decision, to hide and wait for the storm to blow over. We have tried to make contact with whoever is responsible but the culprit remains well hidden behind switchboards and people who won't divulge phone numbers. The RTA must be compelled to revert to the original plan that maintained community access to a SAFE cycleway.The only acceptable solution to the community is the construction of a bridge to traverse the highway as shown on the plans. Boral is constantly stating that they have provided $700,000 to the RTA for the cycleway, as part of this project, and that they will be spending $500,000 on a signalized crossing. Now that our canal has been destroyed we don't want a signalized crossing. WE WANT OUR BRIDGE. So why can't they take the $1.2 million and just build the bridge that they were supposed to build from the start. If the NSW State Government can find $200 million to host a religious event, then a bridge to restore a SAFE cycleway is mere chicken feed. And the cycleway bridge MUST be built BEFORE traffic is allowed to use the Prospect Highway or Transitway. None of the usual far off promises with no budget allocations are acceptable. This is the sensible solution. We just need the planners, approvers and bean counters to understand this. You can help. Write/email/ring the organisations/individuals listed below and tell them you want a safe cycleway with suitable bridges and that you are not happy that Boral and the RTA are ignoring their community responsibilities. Do it TODAY! Do it RIGHT NOW! Ring them, email them! Tell them over and over until they get it! Tell your friends, neighbours, relatives and workmates to visit this site and ask them to write emails/letters of protest as well. Ask your community groups, clubs and schools to include something in their next newsletter. Spread the word far and wide. Also remember that email isn't totally reliable, so if you haven't had an acknowledgement to your email within, say, 3 days, send it again. It is important that it is delivered, so keep sending it until you have received an acknowledgement. Destruction of the heritage canal has commenced! (refer to our photos page to see for yourself) Remember, nothing will change unless YOU let these people know that you want a SAFE cycleway reinstated BEFORE the Prospect Highway or Transitway is opened. So please don't be silent. Silence is seen as acceptance by greedy corporates and mindless bureaucrats. Don't let them get away with it. |
|
Contact the Chairman of Boral. Let him know that you don't find Boral's action towards the community acceptable or consistent with Boral's Code of Corporate Conduct (refer to our Boral page for more info) and that you expect Boral to BUILD OUR BRIDGE.
|
Ken Moss Chairman Boral GPO Box 910 Sydney NSW 2001 email info@boral.com.au phone (02) 9220 6300 fax (02) 9220 6605 |
|
Contact the Minister for Roads and ask why he has allowed the RTA to take away a SAFE cycleway and not provide the promised bridge.
Make it clear to the minister that these actions are not acceptable to the community and demand a SAFE cycleway be restored BEFORE traffic is allowed to flow on the highway or the transitway. |
Eric Roozendaal Minister for Roads Level 36 Governor Macquarie Tower 1 Farrer Place Sydney NSW 2000 email enquiries.roads@roozendaal.minister.nsw.gov.au phone (02) 9228 3535 fax (02) 9228 4469 |
|
Contact the Minister for Planning and let him know that you are not happy that the planning process administered by his department allows community resources to be snatched away from the very people who fund them.
|
Frank Sartor Minister for Planning Level 34 Governor Macquarie Tower 1 Farrer Place Sydney NSW 2000 email rockdale@parliament.nsw.gov.au phone (02) 9228 4700 fax (02) 9228 4711 |
|
The former Member for Smithfield, Carl Scully was instrumental in saving the Canal Reserve. Contact the current local member and ask that he carry on that effort by making personal representations to the Minister for Roads and the Premier to ensure a SAFE cycleway is restored BEFORE traffic is allowed to flow on the highway or the transitway.
|
Ninos Khoshaba Minister for Smithfield (Local Member) PO Box 2518 Smithfield NSW 2164 email smithfield@parliament.nsw.gov.au phone (02) 9756 4766 fax (02) 9756 1544 |
|
Contact the Minister for Western Sydney and ask that she make personal representations to the Minister for Roads and the Premier to ensure a SAFE cycleway is restored to the people of western Sydney.
|
Barbara Perry Minister for Western Sydney Level 33 Governor Macquarie Tower 1 Farrer Place Sydney NSW 2000 email office@perry.minister.nsw.gov.au phone (02) 9228 4820 fax (02) 9228 4484 |
|
Contact the Shadow Minister for Western Sydney and ask that he make personal representations to his government counterpart to have the safety of the cycleway restored on behalf of the people of western Sydney.
|
Barry O'Farrell Shadow Minister for Western Sydney Parliament House Macquarie Street Sydney NSW 2000 email LOP@parliament.nsw.gov.au phone (02) 9230 2270 fax (02) 9221 8208 |
|
Contact the Shadow Minister for Planning and ask that he make personal representations to his government counterpart to ensure the NSW Government's planning process is fixed so that community resources can't be snatched away from the very people who fund them.
|
Brad Hazzard Shadow Minister for Planning Shop 3 637-641 Pittwater Road Dee Why NSW 2099 email brad.hazzard@parliament.nsw.gov.au phone (02) 9981 1111 fax (02) 9981 5059 |
|
Contact the Shadow Minister for Road Safety and ask that he make personal representations to his government counterpart to have the safety of the cycleway restored BEFORE traffic is allowed to flow on the highway or the transitway.
|
Andrew Fraser Shadow Minister for Road Safety 1/9 Park Avenue Coffs Harbour NSW 2450 email coffsharbour@parliament.nsw.gov.au phone (02) 6652 6500 fax (02) 6652 7934 |
|
Contact this project representative and ask why they haven't provided adequate detour signposting for the duration of the construction period as per the Cycleway Management Plan devised by their company. |
John Imrie 0401 896 871 Boral - Senior Development Manager |
|
Contact this project representative and ask why they haven't provided adequate detour signposting for the duration of the construction period as per the Cycleway Management Plan devised by their company. |
Andrew Bondini 0401 895 128 Boral Recycling Pty Limited PO Box 42, Wentworthville NSW 2145 www.boral.com.au |
|
Contact this project representative and ask why they haven't provided adequate detour signposting for the duration of the construction period as per the Cycleway Management Plan devised by their company.
|
Noel Storan 0419 252 680 Burton Ward Joint Venture Site Office (02)9631 2499 www.burtoncontractors.com.au Ward Civil & Environmental Engineering Pty Ltd |